Articles tagged with: Uncategorized

Week 5 – Onsite Demo Construction

Week 5 was about making the systems operational and dealing with cosmetic stuffs at the site. Like always, I had a ton of help. Tim Stanley leveled the site and completed the installation of the Aerobic Treatment System and the Low Pressure Dosing System. These systems are now ready to be plugged to a power […]

Read More

Demo/Training Site Construction: Week 3 and 4

Week three: On week three, we focused on preparing for the tank and plumbing installation that will happen on Week 4. The wooden covers for the above-ground trench mock-ups were constructed. The soil that would be used in the trench mock-ups were collected, oven-dried and sieved. A few buckets of Class A gravel (0.5 to […]

Read More

Week 2 of the Construction: The Oklahoma Onsite Wastewater Training Facility:

We are into week 2 of our construction. “Construction” really sounds weird to me because none of us who are involved in the project have any construction experience. It is a crew of four soil scientists and two high school student workers.  But we got the job done! (and it was fund too). We worked […]

Read More

The Oklahoma Onsite Wastewater Training Facility: Week 1

It’s a good week for the Onsite Wastewater Treatment System (OWTS) industry in Oklahoma. Our State will finally have its own OWTS demonstration/training facility! We got the approval to set it up at the location that we wanted and we immediately started working. The location: We decided to set-up the demonstration facility at the OSU […]

Read More

You Flush It… We Treat It!

” You Flush It… We Treat It” I couldn’t think of a blog site title more fitting that this! It perfectly captures the very idea of what could be expected out this blog site. Blogs in this site aim to serve as a platform for constructive dialogue about the nasty stuffs that we flush in […]

Read More